Proposed Projects

The project will investigate alternate locations for a new bridge over the Black River in the Brownville area. The project is proposed for the Summer of 2021.  A Planning Study for this project is currently underway.  See the…
This proposed project will involve removing and replacing the existing bridge over CSX railroad and Cedar Street. Proposed for summer of 2019.
The existing culvert over Mill creek has deteriorated and will be replaced with a new bridge. Proposed for summer 2017.
This project will construct a new bridge over Rt 26 to allow army personnel to travel between the Wheeler Sack Airport and the main base without leaving the secure area. This will reduce traffic on…
This proposed project is being progressed to address operational issues with the intersection. Intersection will be realigned and turning lanes will be added. Proposed for summer 2016.